24 Independence Group NL
Table 3: Tropicana Gold Mine -100% basis (IGO 30%) – 30 June 2016 Mineral Resources (and 2015 comparison)
Mineral Resources - 30 June 2015
Mineral Resources - 30 June 2016
Tonnes
Grade
Contained
Metal
Tonnes
Grade
Contained
Metal
Classification
(Mt)
Au
(g/t)
Au
(Moz)
(Mt)
Au
(g/t)
Au
(Moz)
Open Pit
Measured
12.8
2.09
0.86
10.9
1.91
0.67
Indicated
75.3
1.85
4.47
78.3
1.71
4.32
Inferred
5.8
2.54
0.48
4.4
2.23
0.32
Sub-Total
93.9
1.92
5.80
93.7
1.76
5.30
Underground
Measured
-
-
-
-
-
-
Indicated
2.4
3.58
0.27
5.4
3.36
0.59
Inferred
5.8
3.14
0.59
12.1
3.13
1.22
Sub-Total
8.2
3.26
0.86
17.6
3.20
1.81
Stockpiles
Measured
13.6
0.87
0.38
13.6
0.85
0.37
Total Tropicana
Measured
26.4
1.46
1.24
24.5
1.32
1.04
Indicated
77.7
1.90
4.74
83.8
1.82
4.90
Inferred
11.7
2.84
1.06
16.6
2.89
1.54
GRAND TOTAL
115.7
1.89
7.04
124.8
1.86
7.48
Notes:
1.
The open pit Mineral Resource is reported at a 0.3g/t Au cut-off for oxide material and a 0.4g/t Au cut-off for transitional and fresh material,
constrained within an a US$1,400/oz Au (A$1,817/oz Au) optimised pit shell based on actual mining and processing costs.
2.
The underground Mineral Resource is reported outside the US$1,400/oz Au pit optimisation based on underground mineable shapes at a
cut-off grade of 2.0g/t Au.
3.
All figures are rounded to reflect appropriate levels of confidence. Apparent differences may occur due to rounding.
4.
Mineral Resources are inclusive of Ore Reserves.
5.
All Mineral Resources are completed in accordance with the 2012 JORC Code.
6.
JORC Code (2012) Table 1 Parameters are contained within IGO’s 2016 ASX Resources and Reserves Statement as released to the ASX which
can be found at
www.igo.com.auTable 4: Tropicana Gold Mine -100% basis (IGO 30%) – 30 June 2016 Ore Reserves (and 2015 comparison)
Ore Reserves - 30 June 2015
Ore Reserves - 30 June 2016
Tonnes
Grade
Contained
Metal
Tonnes
Grade
Contained
Metal
Classification
(Mt)
Au
(g/t)
Au
(Moz)
(Mt)
Au
(g/t)
Au
(Moz)
Open Pit
Proved
11.1
2.27
0.81
7.6
2.33
0.57
Probable
29.0
2.05
1.91
24.2
2.01
1.56
Sub-Total
40.1
2.11
2.72
31.8
2.07
2.12
Stockpiles
Proved
8.4
1.09
0.29
9.2
0.98
0.29
GRAND TOTAL
48.5
1.93
3.01
41.0
1.83
2.41
Notes:
1.
The Proven and Probable Ore Reserves is reported above economic break-even gold cut-off grade for each material type at nominated gold
price of US$1,100/oz (A$1,436/oz).
2.
The Ore Reserve estimate is update based on depletion as at 30th June 2016, using the Resource model from July 2015.
3.
The cut-off grades reported were 0.6/g Au for oxide material and 0.7g/t Au for transitional and fresh.
4.
All figures are rounded to reflect appropriate levels of confidence. Apparent differences may occur due to rounding.
5.
JORC Code (2012) Table 1 Parameters are contained within IGO’s 2016 ASX Resources and Reserves Statement as released to the ASX which
can be found at
www.igo.com.au